ATJ ESB RM Project

Santiago Bernabéu Stadium Playing Field Automation Project (Real Madrid) 2021–2023

 

Project

Overview

In 2019, Real Madrid C.F. launched the ambitious renovation of the Santiago Bernabéu Stadium, aiming to establish it as a global benchmark for sports venues and entertainment arenas. A key objective of this transformation was to generate new revenue streams through an innovative operating model that ensures the stadium can be used 365 days a year.

At the heart of the renovation is the retractable, automated playing field system, stored underground and equipped with cutting-edge technologies to maintain the pitch in optimal condition. The executive project was developed by SENER, and the EPC (Engineering, Procurement, and Construction) contract was awarded to PHB Weserhütte in 2021.

CADE was involved from the early stages as the technical advisor to Real Madrid C.F., overseeing the executive design and EPC tendering process. Later, CADE took on roles as part of the Project Management Team (PMT) and Owner’s Engineering, ensuring optimal development of the project in terms of technical quality, cost, and timeline.

Real Madrid C.F Videos

0

25-meter-long trusses assembled within the stadium

0

Multiple meters deep for underground pitch tray storage

0 M

Thousands of tons of rebar steel, nearly matching the weight of the Eiffel Tower

ATJ Project

History

Construction of the ATJ (Automated Turf System) began in May 2022, immediately after the final UEFA Champions League match at the Santiago Bernabéu. The initial activities included dismantling the existing pitch, with the urgent goal of having the new system ready for the season opener on September 3, 2022.

In November 2023, the ATJ system achieved Provisional Acceptance following operational and maintenance validation and oversight by CADE. Real Madrid C.F. President Mr. Florentino Pérez highlighted this milestone as a resounding success during the club’s General Assembly of Representatives.

Architectural and Operational

Innovations

New Architectural Envelope and Retractable Roof

Designed to deploy in just 15 minutes, enhancing stadium functionality.

Expanded East Stand

Increased seating capacity by over 3,000 spectators.

360° Video Scoreboard

A key component of the stadium’s technological modernization.

Logistics tunnel and underground storage system

Optimized logistics and operational efficiency.

Albacete

Parque Científico y Tecnológico
Paseo de la Innovación 3, 02006 Albacete – España

Tel. +34 967 19 01 72

Factoría CADE

Polg. Ind. Campollano

Av. Adeca, 55, 02007 Albacete

Madrid

C/Raimundo Fernández Villaverde, 53 (Entreplanta) 28020. Madrid – España

Albacete

Parque Científico y Tecnológico

Paseo de la Innovación 3, 02006 Albacete – España

Tel. +34 967 19 01 72

Madrid

C/Raimundo Fernández Villaverde, 53 (Entreplanta)

28020

Madrid – España

Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles.